How can we improve Copyright Clearance in Talis Aspire?

Un-queuing a resource from a pre-clearance rollover queue

The functionality to remove a resource which has been added in error to a pre-clearance rollover queue, so that it can be addressed at this point, rather than trying to amend the problem retrospectively. As we have quite a number of modules which have multiple time periods that fall outside the standard semester dates, this would be helpful to enable us in ensuring that resources which may need a new time period are not accidentally processed to the wrong time period.

2 votes
Sign in
Check!
(thinking…)
Reset
or sign in with
  • facebook
  • google
    Password icon
    Signed in as (Sign out)

    We’ll send you updates on this idea

    Tania Rowlett shared this idea  ·   ·  Flag idea as inappropriate…  ·  Admin →
    completed  ·  Keji Adedeji responded  · 

    It is possible to remove one or more resources from a queue by selecting them and clicking the “Actions” button. This offers the option to “remove from queue”

    0 comments

    Sign in
    Check!
    (thinking…)
    Reset
    or sign in with
    • facebook
    • google
      Password icon
      Signed in as (Sign out)
      Submitting...

      Feedback and Knowledge Base